An important stage of work on the two new thermal waste processing lines at ZUSOK in Warsaw is behind us. We already have 70% of the support structure for the new boilers, which has reached its full height of 37 meters. In recent days we have installed, among other things, the 20-meter high side walls of the first line of boilers. We carried out the operation of installing the feed water tank for the boilers. This was a complicated task due to the location and dimensions of the tank (length: 12.3 m, cross-section: 3.85 m, weight: 18.2 t). In parallel, we are installing primary air ducts and secondary air ducts.