Siemens Energy turbine, thanks to REMAK-ENERGOMONTAŻ S.A. – ZARMEN GROUP, was joined by a generator. The unit passed subsequent tests flawlessly, accepting a gradual increase in power, then the plant’s installation was synchronised with the city’s power grid. Once fully operational, the WWE (Warsaw power plant) will meet its own energy needs and supply tens of thousands of households with heat and electricity generated from mixed waste.