The expansion and modernization of the ZUSOK plant in Warsaw is the largest investment in the thermal processing of mixed waste in Poland. The new plant is currently undergoing numerous commissioning tests. An impressive infrastructure has been built on the same land as the original plant was. Find out about some facts: 👉 built-up area: 29 850 m2 👉 total area (on three levels): 48 400 m2 👉 cubic capacity of the facilities: 670 000 m3 👉 green roofs: 20 000 m2 👉 safe processing of 300 000 tons of mixed waste into heat and power for Warsaw 👉 the 80-meter chimney shaft – the last element of the restrictive flue gas treatment system 👉 meeting and eco-education venue