We are erecting a flyover road to ensure efficient and collision-free waste transportation at ZUSOK. The flyover is more than 100 meters long, and its heated surface will improve safety during the winter season. Vehicles will be weighed before entering the unloading hall and after unloading waste. Specialized scales will be installed near the flyover.